Previous Clients:
MPDI - Works for the Minerals Industry
- Freeport MacMoRan - Climax Molybdenum Company, Climax Mine, Mill Operations, Climax Restart Program Feasibility Study, Bagdad and Fort Madison De-oiling Study
- Bond Gold - Collaseum Project, Build Out and Commissioning
- Rosario Resources - Pueblo Viejo, Transition Ore Merrill Crowe to Carbon Plant Conversion
- Cambior USA - Mt. Hamilton, Prefeasibility Study
- USMX - Casino/Winrock Project, Yankee Project, Alligator Ridge ZADRA to AARL Carbon Circuit Conversion, Gold Strike Project
- Newmont - Yanacocha, Carachuga Phase III, Maqui Maqui Phase II De-Bottlenecking Study and Operational Upgrade
- Freeport MacMoRan - Irian Jaya, 90ktpd and 120ktpd Project Upgrades
- Gold Reserve - Brisas del Cuyuni, Project Development
- Crystallex - World Bank International Center for the Settlement of Investment Disputes, Assembled Technical Team for Mine, Process, Hydrology and Environmental disciplines
- Zurich America - US Federal Court of Appeals, Provided Testimony for Zurich vs. Couer DÁlene Mines, Rochester Slope Failure Claims
- Crown Asphalt - Asphalt Ridge, Resource Estimate and Mine Plan
- Globestar Mining - Cerro de Maimon, 43-101 Feasibility Study QP, Author
- Atlanta Gold - Atlanta Project, Mine Plan
- Cardero Corporation - Pampa de Pongo, Pampa el Toro, Katanga
- European Uranium Resources - Kuriskova Project, 43-101 Prefeasibility Study Metallurgical and Economic Analysis QP
- Nevada Copper Corporation - Pumpkin Hollow Project, 43-101 Single Mill Facility Feasibility Study Metallurgical and Economic Analysis QP, PLUM Feasibility Study Metallurgical and Economic Analysis QP
- Quaterra Resources - MacArthur Copper Project, 43-101 Preliminary Economic Assessment QP
- Singatse Peak Services - Yerington Pit Scoping Study
- Timberline Resources - Talapoosa Project, 43-101 Preliminary Economic Assessment QP
- Minera Chinalco Peru - Toromocho Project, Assembled Technical Team for Mine and Process design and operations review.
MPDI - Works for the Minerals Industry